Cost savings are obtained by reducing the scrap rate for a cylinder block water jacket core.
Cost savings are obtained by reducing the scrap rate for cam shaft castings produced by two shell mold halves.
Cost savings are obtained by reducing the cycle time for a precision sand cover core.
Significant capital cost savings are obtained by optimizing each core in a core package.
Still not convinced? Give us your most challenging core and see what we can do.
10899 Montgomery Blvd. NE, Suite B
Albuquerque, NM 87111 U.S.A
Exit Airport to Interstate 25 North. Take Exit 228, Montgomery Blvd/Montano Rd. Merge on N Pan American Freeway. Turn right onto Montgomery Blvd., for 5 miles. Turn left into Applebee's restaurant parking lot. Travel through restaurant parking lot to two story building parking lot. Drive to north entrance, Suite B, First Floor.
MAIN: For general information regarding Arena-flow or Arena-flow, LLC:
Phone: 505.275.3849 | Fax: 505.275.3346
email: info@arena-flow.com
SALES: To speak with an engineer regarding software licensing or engineering services:
Phone: 505.275.3849 | Fax: 505.275.3346
email: info@arena-flow.com
SUPPORT: To speak with an Arena-flow support engineer:
Phone: 505.275.3849 | Fax: 505.275.3346
email: support@arena-flow.com
